form
Case studies
Pharmaceutical
MEDMAC Ltd: New pharmaceutical department for the veterinary production of injectable formulations in Jordan – Amman
TECO carried out the overall design of the project, the construction of the clean rooms and the technological installations of the sterile department. Completion expected for 2023.
DEI Biopharma Ltd: First pharmaceutical hub for the production of different formulations (Solids – Injectables – Biologicals) in Uganda – Kampala.
TECO carried out the overall design of the works, the construction of the clean rooms and the technological installations of the Generic plant for the production of Oral Solids. Works completed 2020 / 2022. In progress the installation of the Syrups and Ointments departments, followed by the Injectable departments. Completion expected for 2024 / 2026.
PHILEX Pharmaceutical Ltd: New pharmaceutical plant for the production of different formulations (Oral Solids – Sterile) in Oman – Salalah.
TECO carried out the installation of the OSD clean rooms and microbiological laboratories. Works completed in 2021 / 2022. In progress the construction of the clean rooms for the Sterile Department. Completion expected for 2023.
ORO Pharmaceutical Ltd: New pharmaceutical plant for the production of Oral Solid formulations in Uganda – Kampala.
TECO carried out the overall design of the works, the installation of the clean rooms and the technological systems of the departments and laboratories. Completion expected for 2023.
SPA EL KENDI INDUSTRIE DU MEDICAMENT: New pharmaceutical department for the production of Oncology Oral Solids formulation in Algeria – Rahmania.
TECO carried out the overall design of the work, is carrying out the installation of the clean rooms of the departments and the technological systems. Completion expected for 2023/2024.
Medical Device
Teco carried out the overall design, the construction of the clean room and the technological installations.
Works completed in 2022/2023.
TECNOSS Srl: New ISO7 clean room for the production of biomaterials for bone regeneration in Italy – Giaveno (TO).
Teco carried out the overall design, the installation of the clean room and the technological systems. Works completed in 2022/2023.
Special projects
TAKIS Biotech Srl: construction of prefabricated BIOMODULE ISO8 located in the Scientific area of Castelromano (ROME). BLS3 Laboratory for the study and manipulation of dangerous pathogens.
Teco carried out the overall design of the Biomodule, construction and technological installations. Works completed in 2023.
.
Health
Teco carried out the overall design of the work and is carrying out the construction of the outpatient clinic and technological installations.
Work completion expected for 2023.
.
We know how to build what we imagine, interpreting the expectations of our best partner… the customer
tenma.it
farmalock.it
biore.it
tecoswiss.ch
Headquarters Switzerland
T.E.C.O. CLEAN ROOM SA – Piazzetta San Carlo, 2 6314 – 6900 Lugano sales@tecosa.ch www.tecosa.ch Tel. +41 0912 105817
Engineering and production
T.E.C.O. SRL a Unico Socio Via della Meccanica, 17/19/21, 41031 Camposanto Sul Panaro (MO) Italy – info@tecoweb.it www.tecoweb.it Tel. +39 340 3704247 – Fax +39 0535 609465
Spain/Latin America T.E.C.O. SRL Biorè srl – Ronda San Pedro 68 – 08010 Barcelona
Follow us on Linkedin and Youtube
Keep in touch
Copyright © 2022 Teco Web Italia – Via della Meccanica 17/19/21, 41031 Camposanto (MO) Italy – Tel. +39 340 370 4247 – info@tecoweb.it – www.tecoweb.it – P.iva 02168780340 – Privacy Policy